Weekend Progress

Hopefully you all had great weekends.  I have been fighting off another sickness. I swear it’s never ending.  The weather was also kind of gloomy and really cold, so that meant we had to stay inside and work on the house.  By we, I mean David (Eli helped too).

Kitchen: We decided that we want different pendants.  The ones we were eyeing became available again, so we ordered them! Hopefully we like them more.  Here are the current ones we are switching out.Fireplace: The fireplace is almost done being framed.  David built it so that it could withstand a lot of weight.  AKA a giant TV.Doors: We are replacing all of the doors in the house.  The contractor is charging us more money to install the doors, than the doors actually cost, so David is installing them himself.  He installed the half bathroom door and the basement door.  Maybe now that the basement has a door, the dog can’t run in there to take a pee.  Oh wait, he went twice today.Master closet: Our clothes are still all over this freaking house, which makes it hard to keep the house clean and organized.  I still can’t find the majority of my winter stuff.  Anyway, the shelving and priming got done in our master closet.  Which means it needs painting and then we can officially move into our room.I talked to our contractor today and he mentioned they would be done this week.  Thats great, but there is still so much more for David to do! I just hope that we are 100% done by June. That seems really far from now right?

Leave a comment